Nagtalay Project / Vista Alegre Project / Bulawan Deposit
Exploration drilling in the Vista Alegre area and confirmatory drilling in the mothballed Bulawan Mine were terminated in May 2009. A total of 5,172 meters were drilled in the Vista Alegre area, resulting in the delineation of two low-grade gold deposits at an average of 0.7 grams per tone gold. A total of 636 meters were drilled in and around the vicinity of the North Block of Bulawan Mine with mixed results.
<<Previous Next>>
Silangan Project
Lascogon & Danao Properties
Sibutad Project
Sanfran Project